Four Parx

Hildesheim

42,500 m2
Share onFacebook LogoX LogoLinkedIn LogoMail Logo

Four Parx
Hildesheim

Hildesheim benefits from its central location and is easily accessible by all modes of transport, making it an attractive business location. The planning and development of this new area plays a central role in meeting the increasing demand.

The logistics and industrial property is centrally located in the modern North Industrial Park.

Well-known companies such as Coca-Cola, Reifen.com, BÄKO, Tennet and Lidl are located in the immediate vicinity, as are a number of local amenities for your employees. In addition, the property has excellent connections to the German freeway 7 and is easily accessible by public transportation.

Property type
Commercial property, Business park, Industrial property, Light industrial, Logistics property
Address

Baurat-Köhler-Straße

31135 Hildesheim

Status
Under construction
Completion date

2026

Year of construction

2026

Service
Project development
Industries
Clothing, Chemistry, Drugstore, E-Commerce, Electronics, Garden & pet supplies, Logistics, Aviation, Furniture, Pharma, Sport
Special feature

New building with a 3.2 MWp photovoltaic system, WGK3 film, DGNB PLATINUM certification

PROFILE

Surface area

Office & social area 2,400 m²
Mezzanine area 2,400 m²
Hall area 37,700 m²
Divisibility of 4 units from 8,600 m² to 9,900 m²
Stored goods height max. 9.50 m, 10.20 m max height at eaves, 10.00 m max. height at trussing

Gates & parking spaces

Ground-level gates 4 gates, 1 per rental unit (4.50 m x 4.00 m)
Car parking spaces 64
Loading docks/loading bridges 50
PKW-Stellplätze 64

Mobility

E-charging stations 12 x car / bicycle pre-equipped

Equipment

Sprinkler system: FM-Global
Creation of attractive break areas
Smart metering
3.2 MWp photovoltaic system
WGK3 film

Load capacity

Floor load capacity 5 t/m², 7.5 t column load
Column grid 24 m W x 12 m D

Highlights

Ecological

Highlights

Minimization of gray emissions

Climate protection-oriented life cycle considerations were already applied in the planning phase (basic assessment, definition of requirements, site assessment, preliminary planning and design planning).

Circularity & avoidance of pollutants

Use of recycled building materials, especially in civil engineering, in accordance with the DGNB Gold Standard.

Energy efficiency

High-quality building envelope, LED lighting, smart metering

Renewable energies

PV-ready pre-equipment for the installation of a photovoltaic system on the roof.

Conserving water use

Installation of water-saving fittings, smart metering for precise monitoring of water-saving building operation

Biodiversity

Brownfield revitalization. Flowering meadow, large-crowned trees. Insect-friendly outdoor lighting, species-rich perennial plants, bee and insect hotels, birdhouses and herb meadows with only annual mowing.

Environmentally friendly mobility

E-charging stations for cars. Bicycle & pedestrian infrastructure, direct public transport access

Social Highlights

Recreation and Break Areas

Creation of Attractive Break Areas Indoors and Outdoors

Reduction of Noise through High Acoustic Shielding of Quiet and Office Areas

Quality of Life for Residents

Location with Surrounding Industrial and Commercial Use to Avoid Disturbances

Reduction of Noise Emissions through Building Design and Orientation

High Workplace Quality

Attractive Office and Sanitary Areas per Unit

High Comfort in the Building through Enhanced Thermal Comfort According to GEG

Accessibility

Excellent Connection to Public Transportation

Excellent Local Amenities Structure

Facilities for Drivers

Parking Spaces and Sanitary Areas for Truck Drivers

Safety

Safe Traffic Concept through Separation of Pedestrian, Cyclist, Car, and Truck Traffic on the Property

Economic

Highlights

Resilience & Climate Change Adaptation

Climate Risk Analysis: Assessment of Life Cycle Costs Already in the Planning Process

Flexibility & Adaptability

Multi-Tenant Use: Architectural Flexibility of Use and Third-Party Usability through a High Degree of Modularity

Quality & Value Retention

Measures have been taken to increase the building's lifespan and make it usable in the long term

Functionality & Usability

Hazardous Goods Storage According to the Water Resources Act (WGK-3) on the Ground Floor of the Building

FLOOR PLANS

One area

Many possibilities

The 37,700 m² of hall space is divided into 4 bays of approx. 8,600 m² to approx. 9,900 m².

LOCATION

Top location in
Hildesheim

Four Parx

Hildesheim

Baurat-Köhler-Straße

31135 Hildesheim

  • 24/7 industrial area
  • Directly on the highway
  • Urban centers in the immediate vicinity
  • We use cookies to improve your experience on our website. By continuing to use our website, you consent to the use of cookies. Further information can be found in our privacy policy.
    Currently available rental space:
    42,500 m2

    "With its modern implementation, the Hildesheim project offers space for many uses and also impresses with its phenomenal location."

    Marcus Jungheim | Managing Partner

    IMPRESSIONS

    Videos

    Video

    Contact

    What has piqued your special

    interest?

    André Otto looks forward to hearing from you.

    Absenden
    We use cookies to improve your experience on our website. By continuing to use our website, you consent to the use of cookies. Further information can be found in our privacy policy.
    AcceptDecline